Our Process
From Factory to Foundation.
We're With You the Whole Way.
Consultation & Project Scoping
Every project begins with a conversation. We define the scope: number of homes, site conditions, model selection, colors, finishes, timeline, and local requirements. Our engineering team confirms structural compliance for your location.
Consultation & Project Scoping
Every project begins with a conversation. We define the scope: number of homes, site conditions, model selection, colors, finishes, timeline, and local requirements. Our engineering team confirms structural compliance for your location.
Contract & Manufacturing
Once the project scope is finalized, we execute a contract and begin manufacturing your home panels. Our factory produces steel panels with electrical and plumbing already built in. Manufacturing lead time is typically 4–6 weeks.
Contract & Manufacturing
Once the project scope is finalized, we execute a contract and begin manufacturing your home panels. Our factory produces steel panels with electrical and plumbing already built in. Manufacturing lead time is typically 4–6 weeks.
Shipping & Site Preparation
While panels are in transit (35–45 days by container ship), your site preparation begins. Zona Verde coordinates foundation schedules, storage logistics, and material staging. Fabrication items ship first and arrive before the main panel delivery.
Shipping & Site Preparation
While panels are in transit (35–45 days by container ship), your site preparation begins. Zona Verde coordinates foundation schedules, storage logistics, and material staging. Fabrication items ship first and arrive before the main panel delivery.
Crew Training
One week before panel arrival, Zona Verde's project manager and construction engineer arrive on-site. We conduct classroom training and hands-on instruction for your crew. No prior experience with our system required.
Crew Training
One week before panel arrival, Zona Verde's project manager and construction engineer arrive on-site. We conduct classroom training and hands-on instruction for your crew. No prior experience with our system required.
Construction
With the foundation ready, construction begins. Panels are positioned by crane and lock together on a track system. No heavy lifting required. Panels slide into place and secure automatically.
Construction
With the foundation ready, construction begins. Panels are positioned by crane and lock together on a track system. No heavy lifting required. Panels slide into place and secure automatically.
Completion
Your home is complete and ready for occupancy. Every Zona Verde home is delivered with all appliances, fixtures, and finishes installed — move-in ready from day one.
Completion
Your home is complete and ready for occupancy. Every Zona Verde home is delivered with all appliances, fixtures, and finishes installed — move-in ready from day one.
Timeline Comparison
Full Project Timeline: Order to Move-In
A Zona Verde project involves planning, manufacturing, shipping, site preparation, and construction. Here's a realistic timeline and how it compares to traditional construction.
Zona Verde — 4–6 months
Site preparation happens in parallel with manufacturing and shipping — when panels arrive, you're ready to build.
Conventional — 12–18 months
Total construction time: 8–12 months
A Zona Verde home can be move-in ready in 4–6 months. A comparable stick-built home takes 12–18 months.